Dismantling of electric meters with FPE
- Category
- Other projects
+ImpaKT has initiated a project for the dismantling of +- 120’000 electric meters, in collaboration with the Association for professional reintegration “Forum pour l’emploi” a.s.b.l. (FPE) and the grid operator CREOS.
Some 380 tonnes of material can be valorised over 3 years from these old electric meters that are to be replaced by smart grid meters until 2020, following a European Directive.
For more information, see: FPE_newsletter 33